Note that a recent study conducted by Superior Industries engineers at another mining operation revealed some startling figures when applied to particular parameters. After replacing haul trucks and loaders with conveyor systems, this operation experienced savings as high as per ton; 2,800 per day; 14,000 per week; 60,000 per month; and a whopping 700,000 annually.