For each experiment, 3000 g of clinker was weighed, and then the grinding aid + boron compound was added to give a total weight of % cement, and mixed well. The laboratory type ball mill was loaded with clinker and grinding aid mixture and operated for 40 minutes. Samples were taken from the stopped mill, and the SO 3 level was checked.